Welcome to
Slim Parapet & Balustrade Systems for Modern European Buildings
A warm welcome from me personally too.
Good customer contact has been our greatest concern since the beginning. Good customer relationships and an open ear for their challenges are the reason for our solid growth and the development of parapets, balcony railings and parapets. In the future, we will continue to build on a close relationship with our customers – rather with the people who stand behind it and are just as enthusiastic about overtec as we are.
Overtec didn’t come about overnight. Founded in 1978, the focus was on the insulation material trade for two decades. Around 2000, my father brought a prefabricated nesting element onto the market, which is still in high demand today. A good decade later, I came to overtec.
My dream has always been to build a company with which we can inspire people and exceed their expectations. We want to set new standards with our parapet on the flat roof, the balcony railing and the parapet.
Every day we do our best to achieve exactly that. If it doesn’t happen at any time, I’m always open to hearing from you.
Sebastian Hilscher – overtec
About Overtec
The overtec team is divided into three locations: Production and an office in Attnang-Puchheim, another office in Vienna and a sales location in North Rhine-Westphalia. For our customers, we rely on personal proximity in sales to provide you with the best advice on parapets, balcony railings and parapets, while our back office is well digitally networked across our locations and handles your project professionally. We look forward to your inquiry and will do everything we can to exceed your expectations.
Our parapet and balustrade systems are engineered for quality, safety, and durability
From there we grow into the European market with a focus on Germany. After a sales start in 2017, overtec Deutschland GmbH was founded in Munich in 2020. Different market conditions and normative regulations have meant that our product segment has been significantly influenced by both markets.
We are pleased to be working together with the best engineers and testing institutes in Austria and Germany to develop products for the construction industry. Two countries that are known worldwide in the construction industry for innovation, prefabrication and quality in construction.
What drives us
It’s a constant cycle. In the floor plan. In reality, it is a spiral going upwards. First, people become enthusiastic about a product or service. Enthusiasm only occurs when existing expectations are exceeded. Our drive is to exceed expectations and thereby inspire people. If this happens regularly, the enthusiasm will eventually turn into a new expectation. A new standard has been set. And what happens then?
A cycle that always starts again. The only difference is that the foundation of expectations has now been shifted upwards.
We see ourselves as part of the progress in the construction industry and want to actively work to raise the standards in the industry.
We have aligned our company structure to this cycle. Inspire people, exceed expectations, and set new standards.
The mission of overtec.
Through our innovations we want to exceed existing #expectations and thereby #inspire people. Until the
Expectations are permanently shifted upwards and innovations become a “new normal”. Then we have achieved our biggest goal: #setting new standards
Our mission: CO2 save on
The ecological footprint of our building products is recorded in the Environmental Product Decleration (EPD) and can be calculated for each product variant. We see it as our mission to make a difference towards sustainability. On the way there, the EPD represents the first important step: determining the emissions of our manufacturing process and then optimizing them in a targeted manner.
In order to give the topic more visibility, Sebastian Hilscher traveled with a cargo bike from Attnang-Puchheim to Frankfurt under the motto #WirAindRan to transport the last overtec element to the Timber Pioneer showcase project.
Our products
Our Answers to Current Trends
Cement causes 7% of global CO2 emissions. And therefore more than the entire aviation industry. What we can do in the construction industry? For example, recording the emissions of products to make product comparisons possible and using alternative building materials. Concrete will certainly not disappear, but certain components can be reduced or emissions can be reduced through optimizations in the recipe.
Overtec produces 63% fewer emissions compared to conventional concrete parapet elements. Due to the slim design of the overtec elements, fewer emissions are emitted when compared to components. What is not yet taken into account is the massive weight savings achieved by overtec, which means that less material has to be used indirectly for other components. For example, ISO baskets can be dimensioned more easily and ceiling thicknesses of cantilevered balcony elements can be reduced, even eliminating the need for support elements.
Sebastian Hilscher rides his cargo bike from Attnang Puchheim to Frankfurt to deliver the last overtec. The aim of the campaign is to set an example and to highlight the reduced-emission construction of the pioneering Timber Pioneer project by UBM Development and overtec. The components from overtec fit perfectly into the planning concept of a wooden hybrid building.
CO2 Emission
Shortage of skilled workers
The shortage of skilled workers in construction continues to increase. In 2021, 67% of construction companies stated that the shortage of skilled workers has a significant impact on the development of their own company. In 2010 this figure was only 21%. In addition, 1/3 of all construction companies have problems integrating skilled workers into the company.
overtec is taking two options to counteract the shortage of skilled workers.
1. The amount of work on the construction site is reduced as more prefabrication takes place in the hall.
Our motto #handgripminimalest has several meanings. With regard to the shortage of skilled workers in construction, it means thinking twice about every step that is necessary on the construction site. Can we save a bit change? Can we save on tools? Can we do without aids such as electricity, cable drums, etc.?
2. Work on the construction site is kept as simple, easy and uncomplicated as possible.
This improves working conditions and reduces the demands on the level of training. Can we label instructions and accessories sufficiently well so that steps do not have to be done twice? Is our product designed to be “fail-proof”?
Initiatives based on our motto #handgripminimalest
+ Development of the OneBit screw. No more bit changing.
+ Connection of the overtec elements via connecting dowels. No use of electricity.
+ optimal marking of the accessory material and understandable instructions. No double handles.
The need for explanation is as minimal as possible to avoid misunderstandings.
Housing shortage
While 400,000 apartments are needed per year in Germany to meet demand, only 245,000 were built in 2022. At the same time, most apartments were built in cities with fewer than 100,000 inhabitants. However, the greatest influx and demand is in large cities. Why is housing construction lagging behind in cities?
Available plots of land are often small and difficult to build on. Property boundaries, distances to neighboring buildings and maximum building heights pass on major tasks to planners and architects. Even in multi-story residential buildings, every cm often counts.
overtec is taking two options to counteract the shortage of living space.
1. Slim parapets for more terrace or living space.
With overtec, terrace areas can be converted sometimes 35cm larger compared to conventionally manufactured parapet constructions. This leaves either more terrace space, or a shift in the masonry for more living space. Besides the fact, The existing space can be used much better to create new architectural possibilities.
2. Offset cover plates for maximum installation height.
Every cm counts when it comes to height. The overtec The cover plate usually forms the highest design point of the construction height. By reducing these Cover plate, about 25cm more height can be hollowed out.
If we looked at a building as a machine...
…, then we would install parts that are lighter, require less material and work more efficiently. In a gasoline engine, every component, right down to the last one, is energy-optimized. Why not in a building? overtec emits 63% fewer emissions during production and uses less energy over the entire life of the building.
The heat calculation shows: A concrete attic is also heated compared to overtec. In the illustration on the left, significantly more material is obviously required. The concrete element, which is around 4-8 times as thick, requires, in addition to the reinforcing iron, insulation that is placed around the component. The construction means that the attic is heated and cooled at the same time. When looking at the overtec element, it is noticeable that there is no internal insulation and that the heated and cooled elements are limited to the wall and the ceiling.
If saving energy is our responsibility, energy production could become our hobby.
Voluntary in some countries, mandatory in others: the photovoltaic system on the roof. overtec increases the roof area by up to 35cm per linear meter. On a roof with a 100m surrounding attic, 35m2 more usable roof area is created. Depending on usage From 35m2 Our elements not only help with our responsibility to save energy, but also create more space for generating energy.
Our material
- overtec CORD
- overtec FOLT
No wood and no concrete. Wood concrete.
A chaotically sorted wood fiber mixture which is pressed and dried at 300 bar.
The mixture consists of fine wood particles, cement, water and hydration additives. While the wood particles serve as reinforcement and provide properties such as easy workability and high elasticity, the cement content ensures weather resistance and high compressive strength. The basic technical properties are anchored in EN 13986:2004+A1:2015, while the values actually achieved are usually significantly higher.
Ingredients:
Safety data sheets, performance declarations,
Fire safety tests are available upon request.
We proudly present:
A special material needs a special screw.
See our
Youtube video about it
OneBit screw collection
Approved Accessories for Safe and Compliant Installation
A well-designed system is only half the marathon. Error-free and professional application on the construction site brings us to our goal. In order to offer a well thought-out system, we only use approved screw material. In order to achieve the goal, we have packaged all screws in such a way that mix-ups and incorrect use can be ruled out.
Mit Stolz präsentieren wir:
FAQ's
Overtec GmbH was founded in 1978 and initially established itself as a specialist in the trade of insulation materials. Over two decades, the company expanded its expertise in this area and consolidated its reputation as a reliable partner in the construction industry. In 1999, a decisive development marked a turning point in the company's history: Nikolaus Hilscher developed the first prefabricated building component, the overtec prefabricated shaft. This innovation significantly expanded the company's product portfolio and ushered in a new era of specialization and expansion.
Overtec is proud to be a family business that relies on tradition and innovation in equal measure. Nikolaus Hilscher led the company with vision and commitment for around 30 years before his son Sebastian Hilscher joined the company. Father and son jointly steered the fortunes of overtec for over a decade, constantly developing and modernizing the company. In recent years, Nikolaus Hilscher has increasingly focused on sales to long-standing customers, while Sebastian manages the operational business and shapes the next generation of company management.
Sebastian Hilscher, as CEO of overtec, has played a crucial role in the continuation and stabilization of the company since he took over all shares from his father Nikolaus Hilscher in 2019. Under his leadership, overtec successfully navigated the challenges of the COVID-19 pandemic as well as the turbulent times triggered by the Ukraine war. Sebastian Hilscher led the company through these crises with determination and strategic skill, focusing on overtec's adaptability and sustainability.
Overtec's headquarters are located in Attnang-Puchheim, Austria, and form the central heart of the company. This strategic location enables overtec to efficiently coordinate its business activities and consolidate its strong presence in the region. In addition, overtec also has secondary offices in Vienna, 1040, and Munich, 80802.
Overtec's production facility is located in Attnang-Puchheim, Austria, and offers strategic advantages for the company. This central location allows overtec to serve the Austrian market efficiently while ensuring quick accessibility to both Munich and Vienna. This enables overtec not only to optimally cover domestic demand, but also to supply cross-border markets quickly and flexibly, which contributes to the company's competitiveness and customer focus.
Overtec is fully owned by Ampex SNS GmbH, which in turn is 100% owned by Sebastian Hilscher. The name Ampex SNS stands for "Amaze People, Exceed Expectations, and Set New Standards", which reflects overtec's ambitious goals. These three terms are deeply anchored in overtec's corporate values and shape the daily work and the company's strategic direction. Through these clearly defined demands, overtec continuously strives to inspire customers and set new standards in the industry.
Overtec is fully owned by Ampex SNS GmbH, which has its headquarters in Vienna, 1040. This structure allows overtec to benefit from the strategic advantages and resources of the parent company. In addition to overtec, overtec Deutschland GmbH is also one of the subsidiaries of Ampex SNS GmbH, which strengthens the company's international presence and influence. This company structure ensures overtec a solid basis for growth and innovation by creating synergies between the various subsidiaries while integrating the values and goals of Ampex SNS GmbH in all areas.
The philosophy of overtec is based on the desire to amaze people, exceed expectations and set new standards. These principles, derived from the English terms "Amaze People, Exceed Expectations, and Set New Standards", are at the core of everything the company does. By continuously exceeding expectations, overtec's customers become accustomed to this high level, which in turn forms the basis for new standards. This cycle of constant improvement and innovation drives overtec to always go one step further, to continue to develop and to remain a leader in the industry. In this way, the philosophy becomes the driving force that encourages the company to always surpass itself.
Overtec's values include sustainability, continuous improvement, delighting people, exceeding expectations and setting new standards. These principles are deeply rooted in the company's operations and strategic decisions and ensure that Overtec lives up to its commitment to environmental responsibility. Through continuous innovation and a focus on customer satisfaction, Overtec strives to remain an industry leader. By delighting customers and exceeding expectations, they create a cycle of continuous improvement that enables them to continually set new standards and develop future-oriented solutions.
Overtec sets itself ambitious goals to make its contribution to the transformation of the construction industry. With the aim of setting new standards, the company pursues innovative approaches to the development of modern construction methods. This also aims to save manual steps in the construction process, which actively counteracts the shortage of skilled workers. These efforts reflect overtec's commitment to innovation and environmental responsibility. A central aspect of their mission is to drive the sustainable transition in the construction industry by focusing on environmentally friendly practices and offering future-oriented solutions.
Overtec places great value on sustainability and uses innovative wood-cement panels in the manufacture of parapets, parapets, shaft elements and other building products. These materials emit up to 67% less CO2 than conventional versions, which significantly reduces the carbon footprint. By using these environmentally friendly alternatives, overtec underlines its commitment to climate protection and resource conservation. The EPD certificates issued to overtec can also be used for DGNB certification.
Overtec offers a wide range of products, including parapet elements, parapets and shaft elements, as well as other innovative solutions such as balcony partitions, planters, metal railings and privacy parapets. These products are specifically designed to optimize work processes and reduce the need for manual handling in order to counteract the shortage of skilled workers in the construction industry. Their well-thought-out design helps to increase efficiency on construction sites while enabling high-quality and sustainable construction projects. Overtec is thus positioning itself as a pioneer in providing solutions that meet the current challenges of the industry.
When manufacturing parapet and balustrade elements, overtec uses a wood-cement board that meets the requirements of EN13986. This standardized substrate is available in two fire protection qualities: A2 and B1. Depending on the customer's requirements, the appropriate board is selected to meet both safety standards and individual needs. The A2 product is called CORD, while the B1 variant is known as FOLT. This diversity enables overtec to offer tailor-made solutions that meet both the highest fire protection requirements and flexibility in use.
Overtec offers two different types of panels: the CORD and the FOLT panel. The CORD panel is available in the high-quality A2 quality, while the FOLT panel is sold in B1 quality. Depending on the product requirement, the panel thicknesses vary between 24mm and 40mm to meet the specific construction requirements. The CORD panel has a raw format of 335cm x 125cm, while the FOLT panel is offered in a raw format of 320cm x 125cm. This selection enables overtec to offer tailor-made solutions for different construction projects that meet both the highest safety and flexibility requirements.
The panels used by overtec are characterized by properties that comply with the requirements of EN13986. Our detailed product data sheets contain all relevant parameters that provide insight into the specific performance characteristics of the panels. In particular, they provide important information on fire protection, sound insulation and flexural strength, which are essential for different architectural requirements. This detailed information enables customers to ensure that the panels meet the required specifications for their building project and offer the highest safety and performance standards. The documents are available from our team on request.
The overtec panel can be easily processed directly on the construction site using a hand-held circular saw equipped with a hard metal saw blade or a diamond disk. However, it should be noted that processing becomes more difficult as the cement sets. It is therefore recommended that the overtec material be processed as soon as possible after delivery. The cut surfaces do not need to be specially treated, which significantly reduces the amount of work required. During the construction phase, a cover plate is attached to the top, which effectively protects the upper cut edge from water ingress and thus ensures the longevity of the construction.
